Front suspension going on for good now. First is the left side, the remainder are of the right side. Not a lot to say here- just going together as it should. Note the new stub axle on the right side. Bearings are all greased and packed. All bearings and seals are new. The torsion bars are linked up. I need to snip and fold over the cotter pins on most of this assembly yet. I held off until I was sure that I didn't install something out of order or backwards and at this point it's looking proper. Castle nuts and cotter pins are a huge pain. It is so much easier and faster with modern nylock nuts. Also, in the top photo you can see the brake cylinders poking through the brake back plate
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment